/ The platform · Budget control

See the true cost position before the invoices land.

This is how Budget Control actually works: from setting the advisor budget, through tracking committed and actual spend against scope, to the IC-ready cost story at the end. The same continuously-current view the deal lead acts on, walked through step by step.

01 The lifecycle

How a deal budget moves through AdviLink.

The homepage compresses this into a sentence. Here is the mechanical version: five steps, from the first budget line to the export the investment committee reads.

01

Set the advisor budget, per workstream

Lay out the deal the way you scope it: legal, financial, tax, commercial, environmental. Each workstream carries the engagement-letter fee cap, the advisor, and a budget figure in GBP. This is the baseline every later number is measured against.

Baseline · fee cap per engagement letter
02

Track committed vs. actual vs. forecast as work happens

As advisors work and bill, each line carries three live figures: committed (what you are on the hook for), actual (billed to date), and forecast (where it lands). The deal lead sees the current cost position instead of reconstructing it from PDFs after the fact.

Committed · Actual · Forecast — continuously current
03

Capture a scope change the moment it is agreed

When an advisor proposes extra work, record it then and there, with its cost impact, rationale and an approval status, while there is still leverage to challenge it. A change becomes a record, not a conversation you half-remember when the invoice lands.

Requested → Approved / Declined, with cost impact attached
04

RAG status surfaces overrun risk before the invoice

Forecast over the fee cap flips a line to amber, then red, and rolls up to a single deal-level signal. You find out a workstream is heading over while there is still time to act, not when finance reconciles the bill after close.

Red / Amber / Green — per line, rolled up to the deal
05

Export the IC-ready cost story

Generate the cost narrative — approach, scope, spend, variance and rationale — as an IC-ready PDF, and the budget-vs-actual schedule as Excel for finance. The picture is always the current one, generated rather than assembled by hand from hindsight.

IC-ready PDF · Budget-vs-actual Excel
02 The budget control surface

Every step lands in one place: budget, committed, actual and forecast against scope.

Budget ControlLIVE
Project Meridian
Buy-side acquisition · Diligence · Stage: Confirmatory
Updated 2 hours ago
5 workstreams · 6 advisors
Budget
£1.24m
Committed
£1.09m
Actual
£742k
Variance
−£58k
WorkstreamBudgetActualForecastVariancevs budget
Legal£420k£268k£408k+£12k
Financial£340k£231k£356k−£16k
Tax£190k£158k£238k−£48k
Commercial£180k£71k£166k+£14k
Environmental£110k£14k£96k+£14k
Tax · scope change pending approval (+£48k)RAG: 3G / 1A / 1R
03 Under the hood

What the surface is built on.

Three things make the cost position trustworthy: the model the numbers live in, the logic that flags risk, and the formats they leave in.


The data model

Deals roll up from line items — every figure is a GBP amount, never a guess

A deal holds workstreams; a workstream holds advisors; an advisor holds line items. Budget, committed, actual and forecast live on the line and aggregate upward, so the deal total is the sum of the work, not a separately maintained number that can drift.

  • Deal → workstream → advisor → line item, all GBP
  • Amounts held as exact decimals, not floating-point estimates
  • Totals roll up automatically — change a line, the deal re-totals
Project Meridian · structure5 WORKSTREAMS
Tax
Structuring counsel · 2 line items
£190k
└ Base structuring review
Engagement-letter scope
£142k
└ Additional structuring analysis
Scope change · pending
+£48k
ROLLS UP TO DEAL
£1.24m total

Overrun-risk logic

RAG is forecast against the cap, not spend against a calendar

A line is green while the forecast sits under its fee cap, amber as it approaches, and red once the forecast — including any pending scope change — would breach it. Because the signal is forward-looking, a workstream can read red while it is still under-billed: the warning arrives before the money is spent.

  • Green: forecast within the fee cap
  • Amber: forecast approaching the cap, watch the trajectory
  • Red: forecast (incl. pending changes) would breach the cap
Forecast vs. fee cap · TaxRAG · RED
Fee cap
Engagement letter
£190k
Actual billed
83% of cap — still under
£158k
Forecast
Incl. pending change
£238k
OVERRUN RISK
Flagged before the invoice

Exports

Two formats, one current source: the IC reads a memo, finance reads a schedule

The same live position generates two things. An IC-ready PDF tells the cost story — approach, scope, spend, variance and the rationale behind each change — in the register a partner can put in front of the committee. An Excel schedule gives finance the budget-vs-actual breakdown to reconcile against. Neither is rebuilt by hand.

  • IC PDF: approach, scope, spend, variance, rationale
  • Excel: budget vs. actual by workstream and advisor
  • Always the current position — never a stale estimate
Generate exportCURRENT
IC cost memo · Project Meridian
PDF · approach, scope, variance, rationale
PDF
Budget vs. actual schedule
Excel · by workstream & advisor
XLSX

/ Security & trust

Built for confidential deal data, by default.

Advilink is a neutral operating layer between deal leads and advisors. Deal information is treated the way deal teams expect: enterprise-grade controls, data minimised to what cost control needs.

SOC 2 (in progress)Controls formalised ahead of launch.
UK GDPR alignedUK-first, data minimised to what cost control needs.
SSO & access controlsRole-based access, scoped per deal.
Audit loggingEvery scope change and approval recorded.